# Build Flexible and Secure Power Infrastructure for a Sustainable Future at Scale

## Abstract

To meet the growing demand for power of AI, we have to enable the entire ecosystem, from chip to grid. This lightning talk brings together how NVIDIA is working with its partners from power generation and transmission to distribution to build flexible and reliable infrastructure. This session will focus on use of AI for meeting energy demand, using digital technologies inside data centers to manage peak loads, and applying accelerated computing to simulate the grid and build physical infrastructure.

## AI Summary

- The presenter discussed the challenges of grid expansion and demand outpacing grid growth, focusing on the physical and process constraints, such as the long procurement time for substation transformers and the lengthy approval process for new transmission lines.
- The presentation highlighted the use of AI weather forecasting to improve grid management, particularly in predicting outages and optimizing demand response activities by providing precise weather forecasts at a granular level.
- The concept of dynamic line rating (DLR) was introduced, which uses hourly temperature readings to adjust transmission line capacity, potentially increasing grid efficiency and reliability by up to 10% in some scenarios.
- The speaker from a startup that makes AI factories flexible power users explained how these factories can help utilities manage peak loads by being flexible in their power usage, potentially avoiding the need for massive grid overbuilds.
- Another presenter discussed the evolution of utility technology over the past two decades, emphasizing the shift from revenue meters to intelligent edge devices that can manage the grid more autonomously and respond to real-time data.
- The presentation concluded with the concept of a software-defined grid, where improved compute capabilities at the edge and in the cloud enable better forecasting, planning, and dynamic orchestration of grid elements to enhance service quality and resiliency.

## Transcript

**[00:00:11 – 00:00:15]** okay so lightning talk i didn't quite know what that was until

**[00:00:15 – 00:00:19]** i started to prepare for this and i realized i'm i might sound like

**[00:00:19 – 00:00:21]** an auctioneer a little bit because we have a lot of content to go

**[00:00:21 – 00:00:25]** through um hi everybody my name is Gabe Mika i am a managing director

**[00:00:25 – 00:00:31]** with Accenture's ai and data practice and um before you know

**[00:00:31 – 00:00:36]** joining Accenture i was actually at Sempra and the Sempra utilities for

**[00:00:36 – 00:00:40]** over a decade so my background is really rooted in the utility space

**[00:00:40 – 00:00:42]** Leading data, AI, and innovation.

**[00:00:42 – 00:00:45]** And since I've joined Accenture the last couple years, I've

**[00:00:45 – 00:00:49]** really been focused on applying data and AI to these large

**[00:00:49 – 00:00:51]** end-to-end industry problems.

**[00:00:51 – 00:00:58]** So this topic today is a great example of, like Shantia said, not

**[00:00:58 – 00:01:00]** only how we work with our clients, but how do we work with our

**[00:01:01 – 00:01:05]** ecosystem partners to solve these really, really large problems.

**[00:01:05 – 00:01:09]** And to touch on the challenge again, right, with electrification,

**[00:01:09 – 00:01:13]** with data centers being built out, the demand is really outpacing

**[00:01:13 – 00:01:16]** the grid's ability to grow, right, and there's two main things there.

**[00:01:16 – 00:01:18]** There's the physical constraints, right?

**[00:01:18 – 00:01:20]** You can only build so fast.

**[00:01:20 – 00:01:24]** Substation transformers take a really long time to procure.

**[00:01:24 – 00:01:26]** And then there's process constraints, right?

**[00:01:26 – 00:01:28]** In the beautiful state of California, it could take

**[00:01:28 – 00:01:32]** at least 10 years to get a new transmission line approved,

**[00:01:32 – 00:01:35]** and that is not going to meet

**[00:01:36 – 00:01:41]** The real question becomes, how do we bridge this gap between these

**[00:01:41 – 00:01:45]** aspirational goals of building out this new infrastructure while

**[00:01:45 – 00:01:49]** we're kind of saddled with this current state of these constraints?

**[00:01:49 – 00:01:51]** And that's really what we're going to talk about today.

**[00:01:51 – 00:01:54]** I'm going to touch on a few ideas, but we have a great group

**[00:01:54 – 00:01:57]** of folks that are going to touch on some other thoughts as well.

**[00:01:57 – 00:01:59]** And I'm gonna talk about AI weather forecasting because

**[00:01:59 – 00:02:01]** we've been working with NVIDIA on their Earth-2 platform

**[00:02:01 – 00:02:04]** for the past handful of months.

**[00:02:04 – 00:02:08]** And we've been building out these AI, generatively

**[00:02:08 – 00:02:13]** downscaled models at kilometer and sub-kilometer resolution.

**[00:02:13 – 00:02:16]** And to give you a perspective, most of the models, the industry

**[00:02:16 – 00:02:20]** average is using 10 to 25 kilometer resolution, which

**[00:02:20 – 00:02:23]** becomes very blurry when you're trying to make decisions at a

**[00:02:23 – 00:02:26]** circuit or a circuit segment level.

**[00:02:26 – 00:02:28]** You might be asking yourself, what does weather have to

**[00:02:28 – 00:02:30]** do with utilities and am I in the right room?

**[00:02:30 – 00:02:33]** I'm not sure if you're in the right room, but what I

**[00:02:33 – 00:02:37]** will say is that utilities have been using meteorology and weather

**[00:02:37 – 00:02:40]** predictions for a very, very long time to solve some of their

**[00:02:40 – 00:02:43]** operational business decisions.

**[00:02:43 – 00:02:46]** And a few on the screen here, outage prediction, understanding

**[00:02:46 – 00:02:48]** when the temperature is gonna show up, how is it gonna impact your

**[00:02:48 – 00:02:52]** individual assets, and proactively be able to manage around that.

**[00:02:52 – 00:02:55]** Extreme weather operations, understanding when and where

**[00:02:55 – 00:02:58]** that wind is gonna show up can help you make better decisions

**[00:02:58 – 00:03:01]** around what to de-energize.

**[00:03:01 – 00:03:03]** We're going to talk about DLR and demand response here in a minute,

**[00:03:03 – 00:03:05]** but the value is very clear.

**[00:03:05 – 00:03:08]** There are very clear reliability impacts.

**[00:03:08 – 00:03:11]** There are very clear ratepayer benefits in

**[00:03:11 – 00:03:14]** certain regards, as well as capacity and grid efficiency.

**[00:03:14 – 00:03:17]** And what I would say is as these AI weather forecasting models

**[00:03:17 – 00:03:21]** get better, there's going to be continued opportunity to continue

**[00:03:21 – 00:03:25]** squeezing more value out of these business processes and bringing

**[00:03:25 – 00:03:26]** more value to the organization.

**[00:03:26 – 00:03:27]** I love visualizations.

**[00:03:27 – 00:03:31]** This is our temperature, weather forecasts.

**[00:03:31 – 00:03:34]** Again, when and where is that temperature going to show up?

**[00:03:34 – 00:03:36]** How is it going to impact our assets at a very

**[00:03:36 – 00:03:38]** granular level, right?

**[00:03:38 – 00:03:42]** As well as how are customers going to respond or behave based

**[00:03:42 – 00:03:44]** off of those temperature changes?

**[00:03:44 – 00:03:46]** We can talk about that in a little bit.

**[00:03:46 – 00:03:51]** And on the wind side, and this is going to show you, let's see.

**[00:03:51 – 00:03:55]** This is gonna show you Santa Ana conditions in LA, right?

**[00:03:55 – 00:03:57]** And you're seeing these winds come from the east.

**[00:03:57 – 00:03:59]** They are accelerating over the San Gabriel Mountains

**[00:04:00 – 00:04:03]** and providing additional context on how you might want to manage around

**[00:04:03 – 00:04:05]** one of these high wind events.

**[00:04:05 – 00:04:08]** Becomes very, very important from a community safety

**[00:04:08 – 00:04:11]** perspective and others.

**[00:04:11 – 00:04:13]** I'm gonna touch on dynamic line rating.

**[00:04:13 – 00:04:19]** So with transmission line capacity, right, there is

**[00:04:19 – 00:04:23]** an inverse relationship to temperature and the capacity

**[00:04:23 – 00:04:25]** that these transmission lines, these transmission conductors

**[00:04:25 – 00:04:28]** and corridors can basically carry.

**[00:04:28 – 00:04:33]** And the higher the temperature, lower capacity and vice versa, and

**[00:04:33 – 00:04:37]** for close to 100 years there's been this kind of artificial static line

**[00:04:37 – 00:04:39]** rating that's been established.

**[00:04:39 – 00:04:41]** You know, basically taking the worst case scenario from

**[00:04:41 – 00:04:44]** a physics perspective, from a safety perspective, do not operate

**[00:04:44 – 00:04:47]** the system over this, right?

**[00:04:47 – 00:04:51]** But that is essentially locking in capacity with your existing

**[00:04:51 – 00:04:56]** system that we're trying to untap at this point.

**[00:04:57 – 00:04:59]** In 2021, FERC came out and said, hey, it'd be really

**[00:04:59 – 00:05:02]** great if you started to take these hourly temperature readings

**[00:05:02 – 00:05:06]** and adjust your capacity ratings at that point, which has ultimately

**[00:05:06 – 00:05:09]** driven some incremental value to the tune of five to 10%

**[00:05:09 – 00:05:11]** in certain scenarios.

**[00:05:11 – 00:05:14]** But temperature isn't the only thing that impacts the

**[00:05:14 – 00:05:15]** conductor performance.

**[00:05:15 – 00:05:18]** There's wind, and not just wind, but perpendicular wind

**[00:05:18 – 00:05:21]** to the conductor, which creates this cooling effect and effectively

**[00:05:21 – 00:05:24]** reducing the ambient temperature around the conductor, allowing

**[00:05:24 – 00:05:27]** the conductor and the line to perform better.

**[00:05:27 – 00:05:29]** And that's essentially the point where we're getting

**[00:05:29 – 00:05:33]** to dynamic line ratings, being able to forecast better, not

**[00:05:33 – 00:05:35]** only the temperature, not only the wind, but the direction

**[00:05:35 – 00:05:40]** of the wind, being able to better optimize the supply side and

**[00:05:40 – 00:05:43]** meeting the demands of the grid.

**[00:05:44 – 00:05:47]** From a demand response perspective, again, going back to when

**[00:05:47 – 00:05:50]** and where is that temperature gonna show up, and more importantly,

**[00:05:50 – 00:05:54]** how are the customers going to behave to that temperature?

**[00:05:54 – 00:05:58]** We have some wonderful weather outside, and undoubtedly PG&E

**[00:05:58 – 00:06:01]** has already forecasted the weather.

**[00:06:01 – 00:06:04]** They understand at what temperature people are gonna start turning

**[00:06:04 – 00:06:07]** their air conditioning units on, and they have effectively procured

**[00:06:07 – 00:06:09]** enough energy to match that demand.

**[00:06:09 – 00:06:11]** Right, that's in a perfect scenario.

**[00:06:11 – 00:06:15]** The problem for utilities usually becomes when this is widespread,

**[00:06:15 – 00:06:16]** you have a prolonged heat wave.

**[00:06:16 – 00:06:20]** And weather forecasting and being much more precise on

**[00:06:20 – 00:06:23]** your weather forecast for specific circuit segments

**[00:06:23 – 00:06:27]** allows you to make better decisions around demand response activities.

**[00:06:27 – 00:06:30]** And being very pinpointed, again, ultimately to increase the

**[00:06:30 – 00:06:33]** reliability of the grid as a whole.

**[00:06:34 – 00:06:39]** I'm going to close by saying these are just two concepts that we're

**[00:06:39 – 00:06:43]** talking about today around DLR, increasing capacity, increasing

**[00:06:43 – 00:06:45]** reliability around demand response.

**[00:06:45 – 00:06:47]** But there are many, many more, and you're going to hear about

**[00:06:47 – 00:06:49]** those here shortly.

**[00:06:49 – 00:06:53]** And with that, I'm going to turn it over to Varun.

**[00:07:06 – 00:07:07]** All right, hi everybody.

**[00:07:08 – 00:07:10]** I think you're all in the right room.

**[00:07:10 – 00:07:14]** I wanna talk to you about the other side, the assets

**[00:07:14 – 00:07:16]** connected to the grid.

**[00:07:16 – 00:07:19]** Emerald AI, which we founded just over a year ago, makes

**[00:07:19 – 00:07:22]** AI factories flexible power users.

**[00:07:22 – 00:07:24]** Why is this important?

**[00:07:24 – 00:07:26]** Close your eyes for a sec.

**[00:07:26 – 00:07:28]** Come on, close your eyes.

**[00:07:29 – 00:07:30]** Imagine Highway 101.

**[00:07:30 – 00:07:36]** I know you guys have driven 101 and it's chock full at rush hour.

**[00:07:36 – 00:07:38]** I think many of you might have driven 101 when

**[00:07:38 – 00:07:40]** it's not chock full.

**[00:07:40 – 00:07:41]** Now think of the power grid.

**[00:07:41 – 00:07:45]** The power grid is Highway 101 if it was only rush hour

**[00:07:45 – 00:07:46]** two times a month.

**[00:07:46 – 00:07:50]** That's how underutilized our power grid is.

**[00:07:50 – 00:07:52]** You can open your eyes.

**[00:07:52 – 00:07:55]** Keep that visual in mind though, and I'll tell you why Emerald

**[00:07:55 – 00:08:00]** is working with NVIDIA to make AI factories power flexible.

**[00:08:00 – 00:08:04]** And the reason is, we can avoid a massive overbuild

**[00:08:04 – 00:08:08]** of the grid and fit far more AI factories on today's grid if

**[00:08:08 – 00:08:13]** they're just a little bit flexible in when they choose to use power.

**[00:08:13 – 00:08:17]** That means at the peak rush hour, just a few times a year, that

**[00:08:17 – 00:08:20]** 18-wheeler looks more like a sedan.

**[00:08:20 – 00:08:21]** The opportunity is massive.

**[00:08:21 – 00:08:25]** There's 100 gigawatts of load that we could fit on the grid

**[00:08:25 – 00:08:28]** if data centers were flexible.

**[00:08:28 – 00:08:32]** And we've built partnerships around the world with utilities

**[00:08:32 – 00:08:35]** and, of course, with NVIDIA, who we're super grateful is

**[00:08:35 – 00:08:36]** our largest investor.

**[00:08:36 – 00:08:41]** And together, we're building the world's first commercial-scale

**[00:08:41 – 00:08:43]** AI factory that's power flexible.

**[00:08:43 – 00:08:47]** This is a way to get power to AI factories today, not

**[00:08:47 – 00:08:51]** wait three, five, or ten years, while at the same time reducing

**[00:08:51 – 00:08:55]** costs for local communities.

**[00:08:55 – 00:08:58]** This week, we were delighted to be in Jensen's keynote and to

**[00:08:58 – 00:09:03]** announce our deep integration with NVIDIA's AI factory DSX reference

**[00:09:03 – 00:09:10]** design called DSX Flex, which makes every AI factory power flexible.

**[00:09:10 – 00:09:13]** Let me tell you why this matters so much.

**[00:09:13 – 00:09:16]** Today, the traditional way that you get a connection if

**[00:09:16 – 00:09:19]** you're a data center, is the grid says to you, look, today I might

**[00:09:19 – 00:09:21]** be able to offer you 150 megawatts.

**[00:09:21 – 00:09:22]** That's all I can give you.

**[00:09:22 – 00:09:24]** And maybe in three or five or seven years, I'll give you

**[00:09:24 – 00:09:27]** 400 megawatts as I expand the grid.

**[00:09:27 – 00:09:31]** Now here's the situation if we have a flexible AI factory.

**[00:09:31 – 00:09:36]** Maybe it has some behind the meter or onsite energy resources

**[00:09:36 – 00:09:38]** like a gas plant or a battery.

**[00:09:39 – 00:09:43]** That data center today gets to use the firm grid connection.

**[00:09:43 – 00:09:46]** And because it's flexible, the grid says, look, you can actually

**[00:09:46 – 00:09:48]** get an even larger connection because you're promising to give it

**[00:09:48 – 00:09:51]** back to us when we ask you for it.

**[00:09:51 – 00:09:53]** I'm looking to Shinjini at Southern California Edison

**[00:09:53 – 00:09:54]** for approval, I think she nodded.

**[00:09:54 – 00:09:57]** And on top of that, I might be able to recruit

**[00:09:57 – 00:09:59]** The behind-the-meter resources.

**[00:09:59 – 00:10:02]** All of this together gets me a 500 megawatt AI factory

**[00:10:02 – 00:10:04]** on day one, and when the grid gives me a little more power,

**[00:10:04 – 00:10:06]** I get a one gigawatt AI factory.

**[00:10:07 – 00:10:10]** That's all possible because of the DSX reference architecture

**[00:10:10 – 00:10:15]** that NVIDIA is the leader on, and we're delighted to partner with.

**[00:10:15 – 00:10:18]** Look, a lot of folks say, why AI factories?

**[00:10:18 – 00:10:21]** Can you just leave us alone? We need firm power all the time.

**[00:10:21 – 00:10:23]** I say, invert that paradigm.

**[00:10:23 – 00:10:27]** AI factories could be the most flexible power users in

**[00:10:27 – 00:10:29]** history because of four key traits.

**[00:10:29 – 00:10:31]** The first is they're massive.

**[00:10:31 – 00:10:34]** Compared with the Nest thermostats, where we've got to network

**[00:10:34 – 00:10:38]** together millions of homes, a single AI factory is like a city.

**[00:10:38 – 00:10:41]** If it can flex just a little bit, it has a huge impact.

**[00:10:41 – 00:10:45]** The second reason is compared to other users, AI factories

**[00:10:45 – 00:10:46]** can respond blazingly fast.

**[00:10:46 – 00:10:49]** And I'll show you some of the results.

**[00:10:49 – 00:10:51]** We can control them from a laptop.

**[00:10:52 – 00:10:55]** Third, they're connected at the speed of light around

**[00:10:55 – 00:10:56]** the country and around the world.

**[00:10:56 – 00:11:00]** No other economic user can move its economic activity

**[00:11:00 – 00:11:01]** from one location to another.

**[00:11:01 – 00:11:04]** You can't charge your electric vehicle tonight in Indiana

**[00:11:05 – 00:11:06]** and say tomorrow it's going to be in California.

**[00:11:06 – 00:11:09]** I mean, I suppose you could, but that would be painful.

**[00:11:09 – 00:11:11]** We can do that with AI inference workloads.

**[00:11:11 – 00:11:15]** And finally, the operational impact of curtailment, if you do it right,

**[00:11:15 – 00:11:20]** if you carefully and gracefully slow down workloads or move them,

**[00:11:20 – 00:11:23]** It's lower than if you stop a car factory or if you were

**[00:11:23 – 00:11:28]** to ask a home to change entirely the way they operate.

**[00:11:29 – 00:11:32]** Given all of this, we've demonstrated not once but five

**[00:11:32 – 00:11:36]** times with NVIDIA and our partners like EPRI that we can actually

**[00:11:36 – 00:11:38]** make AI factories flexible.

**[00:11:38 – 00:11:40]** We started in Phoenix.

**[00:11:40 – 00:11:43]** These were A100 GPUs.

**[00:11:43 – 00:11:46]** Moved to Chicago working with Commonwealth Edison and others.

**[00:11:46 – 00:11:48]** Those are H100s.

**[00:11:48 – 00:11:52]** Went to London on Blackwell Ultra with Nebius, and recently

**[00:11:52 – 00:11:53]** announced those results.

**[00:11:53 – 00:11:56]** We actually showcased with Oracle that we could move

**[00:11:56 – 00:11:58]** AI workloads in between locations.

**[00:11:58 – 00:12:01]** If Virginia's got a problem, we move them over to Chicago.

**[00:12:01 – 00:12:05]** And most recently, we announced this week with NVIDIA, our largest

**[00:12:05 – 00:12:08]** demo yet in Hillsborough, Oregon.

**[00:12:08 – 00:12:14]** That all leads us, later this year, forgive me, to our 100 megawatt

**[00:12:14 – 00:12:18]** commercial scale deployment of a flexible AI factory.

**[00:12:18 – 00:12:22]** So the first one in Phoenix, as I mentioned, took A100s

**[00:12:22 – 00:12:25]** and it said, look, when that purple curve peaks, it's a

**[00:12:25 – 00:12:28]** hot day in Phoenix, a million air conditioners are running,

**[00:12:28 – 00:12:31]** and that grid can't sustain that peak load, the AI factory

**[00:12:31 – 00:12:35]** is able to reduce its power, when the grid asks us to, for three

**[00:12:35 – 00:12:39]** hours, let's say, that exact moment when it needs some peak relief.

**[00:12:39 – 00:12:43]** That was the first peer-reviewed, rigorous scientific result, and it

**[00:12:43 – 00:12:46]** was published in a Nature journal, which we're delighted about.

**[00:12:46 – 00:12:50]** First time AI has been proven to be flexible.

**[00:12:50 – 00:12:52]** Then we went to London, we said, what's your biggest problem?

**[00:12:52 – 00:12:54]** They said, we drink too much tea.

**[00:12:54 – 00:12:58]** I kid you not, at halftime of a British football, we

**[00:12:58 – 00:13:01]** call it soccer, game, they turn on their tea kettles.

**[00:13:01 – 00:13:04]** They stop watching TV, they turn on their tea kettles.

**[00:13:04 – 00:13:08]** And the spike causes a gigawatt of load on the top left on the grid.

**[00:13:08 – 00:13:11]** And so Nebius said, all right, we're running a

**[00:13:11 – 00:13:14]** bunch of production-grade realistic workloads.

**[00:13:15 – 00:13:17]** Emerald, can you just slow some of them down during that

**[00:13:17 – 00:13:21]** exact moment of halftime so that the grid, national grid,

**[00:13:21 – 00:13:25]** our partner, will say, the next AI factory that has this behavior will

**[00:13:25 – 00:13:27]** connect you ahead of the queue.

**[00:13:27 – 00:13:29]** You get to connect in a year and not 10 years because you're

**[00:13:29 – 00:13:33]** actually going to save us during this weird British tradition.

**[00:13:33 – 00:13:37]** Forgive me. I really like, I went to school in Britain.

**[00:13:38 – 00:13:40]** Here's an example, a deep dive of what you're seeing.

**[00:13:40 – 00:13:43]** On the top right, you're seeing the trace of what

**[00:13:43 – 00:13:44]** the National Grid asked us.

**[00:13:44 – 00:13:47]** 4 a.m. our time in America, they said, "'Lightning has struck

**[00:13:47 – 00:13:52]** the grid, "'and our autonomous Emerald AI agents "'independently

**[00:13:52 – 00:13:57]** caused a seconds-level response" to reduce by 35%.'"

**[00:13:57 – 00:14:00]** Now, on the bottom right, what you're seeing is all

**[00:14:00 – 00:14:01]** of the different workloads that are running.

**[00:14:01 – 00:14:04]** Most of them are gray, but I highlighted a couple for you.

**[00:14:04 – 00:14:06]** You can see all this chaos happening under the hood, right?

**[00:14:06 – 00:14:10]** That green job, that's a really flexible job that the customer

**[00:14:10 – 00:14:14]** said, look, I don't need the results of this fine tuning run.

**[00:14:14 – 00:14:15]** Right this moment, it can wait an hour.

**[00:14:15 – 00:14:18]** And so we might've slowed it down.

**[00:14:18 – 00:14:20]** Other jobs are starting, they're stopping.

**[00:14:20 – 00:14:23]** That black job starts right in the middle of a power event.

**[00:14:23 – 00:14:28]** Emerald AI Conductor with our AI agents can orchestrate the entire

**[00:14:28 – 00:14:33]** set of workloads to gracefully slow down only the jobs that

**[00:14:33 – 00:14:35]** the customer's okay slowing down.

**[00:14:35 – 00:14:36]** Now, it's not just slowing down.

**[00:14:36 – 00:14:38]** You can also move jobs.

**[00:14:38 – 00:14:40]** So I showed you temporal flexibility.

**[00:14:40 – 00:14:41]** This is spatial flexibility.

**[00:14:41 – 00:14:45]** This is Dominion Energy said, I've got a problem in Virginia.

**[00:14:45 – 00:14:48]** And so we moved AI inference queries from Virginia over

**[00:14:48 – 00:14:51]** to Commonwealth Edison, where they happen to have spare

**[00:14:51 – 00:14:53]** capacity at that moment.

**[00:14:53 – 00:14:57]** You can't do this with any other user of electricity.

**[00:14:57 – 00:15:00]** This is the overall picture of what this can look like.

**[00:15:00 – 00:15:03]** We call this the Flex-Ready Data Center.

**[00:15:03 – 00:15:10]** This data center has not, or this AI factory, has not just the

**[00:15:10 – 00:15:13]** The hardware, the reference architecture, it also has

**[00:15:13 – 00:15:16]** a software layer that we call Conductor that's talking with

**[00:15:16 – 00:15:20]** the grid, it's forecasting, it's observing all the workloads and

**[00:15:20 – 00:15:25]** the operational infrastructure like batteries or cooling or generators

**[00:15:25 – 00:15:28]** on site, and it's orchestrating them together to provide the

**[00:15:28 – 00:15:31]** right response to the power system.

**[00:15:31 – 00:15:35]** We are so proud that Jensen and NVIDIA have announced

**[00:15:35 – 00:15:37]** this commercial-scale deployment, but I want to point you to

**[00:15:38 – 00:15:39]** the quote in the bottom right.

**[00:15:39 – 00:15:41]** That's the governor of Virginia.

**[00:15:41 – 00:15:44]** And what he's saying is, I'm really excited as Virginia,

**[00:15:44 – 00:15:47]** not because it's just a really cool project, but also because

**[00:15:47 – 00:15:52]** it's going to reduce rates or keep rates stable for my communities,

**[00:15:52 – 00:15:54]** because that's what the political midterms will be won and lost on.

**[00:15:54 – 00:15:57]** It's the most important topic in America today,

**[00:15:57 – 00:15:59]** keeping rates stable.

**[00:15:59 – 00:16:01]** So what do we do together?

**[00:16:01 – 00:16:04]** We've asked the entire energy community, come with us.

**[00:16:05 – 00:16:08]** Utilities will help us to connect AI factories faster

**[00:16:08 – 00:16:10]** and design new approaches like Josh is doing at Think

**[00:16:11 – 00:16:16]** Labs to study these large loads and participate in demos with us.

**[00:16:16 – 00:16:19]** Ahsan and EPRI are leaders in bringing the whole

**[00:16:19 – 00:16:20]** community together.

**[00:16:20 – 00:16:22]** And on the AI side, hey, work with us.

**[00:16:22 – 00:16:25]** Let's make power flexible AI factories.

**[00:16:25 – 00:16:29]** Let's develop these reference designs that NVIDIA leads.

**[00:16:29 – 00:16:30]** And let's participate in demonstrations.

**[00:16:30 – 00:16:33]** We've done five, we're ready to do a sixth one with any of you here.

**[00:16:33 – 00:16:35]** I'm looking at Southern California Edison.

**[00:16:35 – 00:16:37]** So with that, these are all of our partners.

**[00:16:37 – 00:16:38]** Come join the ecosystem.

**[00:16:38 – 00:16:41]** Thank you for the time.

**[00:16:46 – 00:16:47]** Thank you, Varun.

**[00:16:47 – 00:16:51]** And I see we'll put you on the spot over and over again.

**[00:16:52 – 00:16:53]** Good morning, everyone. My name is Joshua.

**[00:16:53 – 00:16:55]** I'm the founder and CEO of ThinkLabs AI.

**[00:16:55 – 00:16:57]** So thank you, Gabe, for setting the stage for the industry

**[00:16:57 – 00:17:02]** challenges and Varun for really opening up a whole new assets,

**[00:17:02 – 00:17:04]** a whole new capability.

**[00:17:04 – 00:17:07]** So as ThinkLabs, we try to connect the two together.

**[00:17:07 – 00:17:10]** So how do we bring grid intelligence so that we generate

**[00:17:10 – 00:17:13]** the right flexibility signals?

**[00:17:13 – 00:17:14]** Okay, here we go.

**[00:17:14 – 00:17:18]** For data centers and EV charging and the like,

**[00:17:18 – 00:17:20]** electrification in general.

**[00:17:20 – 00:17:22]** So if you, of course, look back at Jensen's speech from last

**[00:17:22 – 00:17:27]** year, the AI five-layer kick is all based on the foundation of energy.

**[00:17:28 – 00:17:30]** Without energy, we will not have chipsets, we will not have

**[00:17:31 – 00:17:33]** cloud, we will not have AI models.

**[00:17:33 – 00:17:36]** And we would not have AI applications.

**[00:17:36 – 00:17:38]** But this foundation is quite shaky right now.

**[00:17:39 – 00:17:40]** It is an aging infrastructure.

**[00:17:40 – 00:17:42]** It is a constrained infrastructure.

**[00:17:42 – 00:17:47]** So what if we can bring a small fraction of those AI models and AI

**[00:17:48 – 00:17:52]** applications to actually help feed the grid and improve the operation

**[00:17:52 – 00:17:54]** execution planning of the grid?

**[00:17:54 – 00:17:56]** So that's what ThinkLabs does.

**[00:17:56 – 00:17:58]** So in terms of the shaky foundation, so this is probably

**[00:17:58 – 00:18:04]** my 21st year within our system industry, these challenges

**[00:18:04 – 00:18:06]** have been very, very sticky.

**[00:18:06 – 00:18:09]** So we are really in a stage of a perfect storm where there

**[00:18:09 – 00:18:14]** is unprecedented escalating risks met with a lack of resources.

**[00:18:14 – 00:18:18]** Risk includes things like congestions or grid complexity.

**[00:18:18 – 00:18:20]** Include things like the interconnection queue

**[00:18:20 – 00:18:22]** changing all the time.

**[00:18:22 – 00:18:24]** Every single time the queue changes, the whole system

**[00:18:24 – 00:18:26]** needs to be restudied.

**[00:18:26 – 00:18:29]** And quoting a recent IOU we're working with, a cluster study

**[00:18:29 – 00:18:32]** on transmission cost them about half a quarter million dollars

**[00:18:32 – 00:18:35]** over maybe half a year or so.

**[00:18:35 – 00:18:37]** So and then we have major events that's really impacting

**[00:18:37 – 00:18:42]** system reliability, but we don't have a lot of resources, meaning

**[00:18:42 – 00:18:43]** data being our key resource.

**[00:18:44 – 00:18:46]** We have key data quality and siloed issues.

**[00:18:46 – 00:18:48]** We have workforce constraints.

**[00:18:48 – 00:18:52]** When I joined the utility about 20 years ago, I was the first

**[00:18:52 – 00:18:55]** engineer they hired in 13 years.

**[00:18:55 – 00:18:58]** And at that time, 50% of the utility population could

**[00:18:58 – 00:19:00]** retire in five years.

**[00:19:00 – 00:19:03]** That number is the same pretty much today, if not even worse.

**[00:19:03 – 00:19:07]** So workforce renewal, knowledge retention is a key one.

**[00:19:07 – 00:19:10]** Then there is stakeholder pressure, such as on rates

**[00:19:10 – 00:19:12]** and on time to power.

**[00:19:12 – 00:19:14]** So my middle son's a cuber.

**[00:19:14 – 00:19:16]** He likes to do Rubik's cubes.

**[00:19:16 – 00:19:18]** But in terms of our power system, it's

**[00:19:18 – 00:19:21]** like a millionth dimension cube.

**[00:19:21 – 00:19:25]** And we only have capacity and capability to do tunnel

**[00:19:25 – 00:19:29]** vision and sort of twist a corner and solve, not really

**[00:19:29 – 00:19:32]** solve, but hack a corner at a time.

**[00:19:32 – 00:19:35]** The problem is you solve one part of the puzzle, you mix

**[00:19:35 – 00:19:37]** up everything else.

**[00:19:37 – 00:19:40]** And so the key is automation of the system.

**[00:19:40 – 00:19:43]** We need a better way to automate solving the whole grid.

**[00:19:44 – 00:19:44]** So we are GTC.

**[00:19:45 – 00:19:46]** We love talking about autonomous vehicles.

**[00:19:46 – 00:19:48]** Yeah, that's really, really cool.

**[00:19:48 – 00:19:52]** But I would argue that the electron highway and the autonomous

**[00:19:52 – 00:19:57]** grid is way more critical and a much bigger opportunity

**[00:19:57 – 00:19:59]** than autonomous vehicles.

**[00:19:59 – 00:20:01]** I'm biased, but that's okay because I'm an engineer.

**[00:20:01 – 00:20:03]** Power engineer, I'm sorry.

**[00:20:03 – 00:20:06]** So really in terms of looking at the electron highway, we see a very

**[00:20:06 – 00:20:10]** similar analogy to like autonomous driving where when we open up our

**[00:20:10 – 00:20:15]** driving apps, we're not calculating velocity vectors and probabilistic,

**[00:20:15 – 00:20:20]** like how long we wait at red lights and turn by turn.

**[00:20:20 – 00:20:23]** So we're not numerically calculating traffic.

**[00:20:23 – 00:20:28]** It's an AI model that scans and studies the entire system.

**[00:20:28 – 00:20:32]** The whole grid in our case all the time when we need to

**[00:20:32 – 00:20:37]** route from A to B it's not a fresh numerical study but it's a prompt

**[00:20:37 – 00:20:41]** on a continuous analysis system and this system would also flag

**[00:20:41 – 00:20:45]** us whenever traffic pattern changes or whenever there's a better route

**[00:20:45 – 00:20:52]** so it's pushing solutions to me not engineering individual ad hoc

**[00:20:52 – 00:20:57]** studies so we're turning that type of paradigm around from studies

**[00:20:57 – 00:21:04]** So I said I'm going to put SCE on the spot, so here's

**[00:21:04 – 00:21:08]** just quoting the example that we have worked with them on.

**[00:21:08 – 00:21:11]** So SCE, especially on the distribution and sub-transmission

**[00:21:11 – 00:21:14]** levels, going through tremendous load growth.

**[00:21:14 – 00:21:16]** The amount of time taken to do each of these studies,

**[00:21:16 – 00:21:20]** even a distribution, takes anywhere from 30 to 45 days, and so

**[00:21:20 – 00:21:22]** it's a very manual effort as well.

**[00:21:22 – 00:21:25]** So really the challenge is, can we go from, again as Varun

**[00:21:25 – 00:21:26]** was saying, Thank you for watching!

**[00:21:26 – 00:21:32]** Worst case studies into 8760s, so hourly for the whole year.

**[00:21:32 – 00:21:36]** Can we overlay those who want to interconnect to the system?

**[00:21:36 – 00:21:41]** Not just data centers, but even buildings, charging hubs, etc.

**[00:21:41 – 00:21:43]** Can we find the issues, but not stop there?

**[00:21:43 – 00:21:45]** Because today we just have a sea of red issues.

**[00:21:45 – 00:21:49]** We need solutions to problems, but automatically generate

**[00:21:49 – 00:21:54]** solutions such as flexibility, such as battery storage, and

**[00:21:54 – 00:21:55]** write them a report.

**[00:21:55 – 00:21:58]** Again, in the past, each of these applications take 30 to 45 days.

**[00:21:58 – 00:22:02]** We process it for a huge area system within two and a half

**[00:22:02 – 00:22:04]** minutes on five GPUs.

**[00:22:04 – 00:22:08]** So really, I think that's really the acceleration.

**[00:22:08 – 00:22:11]** We are an NVIDIA developer conference, so our stack is

**[00:22:11 – 00:22:16]** powered by NVIDIA CUDA plus QDSS, all data is cloud-native

**[00:22:16 – 00:22:20]** on Czar format and streamed efficiently through a Rust I.O.

**[00:22:20 – 00:22:22]** layer. That is actually the bottleneck.

**[00:22:22 – 00:22:25]** It's not the GPU speed, but it's loading data and really

**[00:22:25 – 00:22:29]** having minimal or no layover at the CPU level.

**[00:22:29 – 00:22:32]** So all the magic then happens on the GPU side where we're

**[00:22:32 – 00:22:36]** using QPy, QDSS to do the smart solving and all the

**[00:22:36 – 00:22:39]** AML trainings on PyTorch plus CUDA.

**[00:22:39 – 00:22:44]** This framework, this pipeline allows us to study very large

**[00:22:44 – 00:22:48]** systems simultaneously within like sub-seconds.

**[00:22:48 – 00:22:52]** So it's a very highly efficient system, again, thanks to

**[00:22:52 – 00:22:54]** NVIDIA frameworks.

**[00:22:55 – 00:22:59]** But our system is more complex than just worst-case scenarios.

**[00:22:59 – 00:23:02]** It is also more complex than dynamics.

**[00:23:02 – 00:23:03]** It is extremely probabilistic.

**[00:23:03 – 00:23:05]** So Gabe talked about Earth-2.

**[00:23:05 – 00:23:09]** So in our application, Earth-2 is how do we bring probabilistic

**[00:23:09 – 00:23:14]** weather scenarios into load and solar forecast, into

**[00:23:14 – 00:23:18]** probabilistic congestion scenarios, and then traverse

**[00:23:18 – 00:23:23]** that all the way to a risk-adjusted solutioning with confidence.

**[00:23:23 – 00:23:26]** So for example, here the weather's changing, we need

**[00:23:26 – 00:23:28]** to dispatch flexibility.

**[00:23:28 – 00:23:33]** So if I send a flexibility signal to Varun, what's my confidence

**[00:23:33 – 00:23:36]** that that flexibility signal will actually mitigate grid issues?

**[00:23:36 – 00:23:39]** That's what we're solving right now with Earth-2.

**[00:23:39 – 00:23:44]** And especially for transmission, each of those probabilistic

**[00:23:44 – 00:23:46]** timestamps actually need to run half a million

**[00:23:46 – 00:23:48]** contingency scenarios.

**[00:23:48 – 00:23:52]** So it's complexity upon complexity, hence high-performance compute

**[00:23:52 – 00:23:54]** is absolutely necessary.

**[00:23:54 – 00:23:55]** So where are we going in the end?

**[00:23:56 – 00:23:58]** So I said we started as an autonomous grid unit within GE.

**[00:23:58 – 00:24:01]** We spun out from GE about two years ago.

**[00:24:01 – 00:24:05]** And so this has always been the direction, the North Star,

**[00:24:05 – 00:24:09]** which is how much can we automate the actual grid process?

**[00:24:09 – 00:24:12]** So it's broken up into five stages, and I don't have time

**[00:24:12 – 00:24:14]** to go through the five stages.

**[00:24:14 – 00:24:16]** But now the key is in the utility space, we

**[00:24:16 – 00:24:20]** have this notion of crawl.

**[00:24:20 – 00:24:24]** We're trapped in that loop all the time.

**[00:24:24 – 00:24:28]** It's a self-fulfilling prophecy in the name of reliability

**[00:24:28 – 00:24:29]** and conservatism.

**[00:24:29 – 00:24:32]** We are in a stage where we've just got to run.

**[00:24:32 – 00:24:35]** Society requires us to run.

**[00:24:35 – 00:24:38]** And I think AI has reached a stage where we are hyper accelerating

**[00:24:38 – 00:24:40]** innovation and progress.

**[00:24:40 – 00:24:45]** We're democratizing advanced analytics in a way unseen before.

**[00:24:45 – 00:24:48]** So Moore's law applies to grid tech as well.

**[00:24:48 – 00:24:51]** And we are working on pretty much every single one of these

**[00:24:51 – 00:24:53]** pieces right now.

**[00:24:53 – 00:24:57]** And really the key point is AI is here and now and we

**[00:24:57 – 00:24:58]** can make progress.

**[00:24:58 – 00:25:00]** And so thank you for this time and look forward to

**[00:25:00 – 00:25:04]** collaborating with all of you.

**[00:25:10 – 00:25:12]** That's a good one.

**[00:25:19 – 00:25:22]** And now for something completely different.

**[00:25:22 – 00:25:28]** So I'd like to be talking about trying to define for you

**[00:25:28 – 00:25:32]** what NVIDIA and we are referring to as the software-defined grid.

**[00:25:32 – 00:25:34]** But I think first I need to sort of talk about which part

**[00:25:34 – 00:25:36]** of the grid I'm talking about.

**[00:25:36 – 00:25:39]** And this is not about transmission or generation.

**[00:25:39 – 00:25:41]** This is about the distribution part of the grid.

**[00:25:41 – 00:25:45]** But it's really about the part of the distribution grid that I think

**[00:25:45 – 00:25:48]** of as delivering energy for humans.

**[00:25:48 – 00:25:51]** And what exactly do I mean by that?

**[00:25:52 – 00:25:54]** Well, we talk a lot, and there are serious and significant

**[00:25:54 – 00:25:59]** issues with trying to deliver an energy to machines.

**[00:25:59 – 00:26:04]** So massive growth in data center demand, manufacturing, and so on.

**[00:26:04 – 00:26:07]** But in the end, the output of these machines is going to be

**[00:26:07 – 00:26:10]** in service of humans that I think are going to exist for a little

**[00:26:10 – 00:26:12]** while longer, at least I hope so.

**[00:26:12 – 00:26:15]** They don't live in data centers, they are distributed all across

**[00:26:15 – 00:26:18]** the fourth space of the earth, and they're experiencing sort

**[00:26:18 – 00:26:19]** of electrification of everything.

**[00:26:19 – 00:26:23]** So EVs are going to have robots in the home, any number of

**[00:26:23 – 00:26:24]** things like that.

**[00:26:24 – 00:26:29]** And utilities are trying to balance both of these needs and concerns.

**[00:26:29 – 00:26:33]** You have heard, I think, a little bit about, from Josh

**[00:26:33 – 00:26:37]** had touched on, there is this tendency to think of utilities as

**[00:26:37 – 00:26:39]** sort of crawling and then running.

**[00:26:39 – 00:26:41]** What I, you will hear if you're outside the industry, that

**[00:26:41 – 00:26:44]** they're slow moving and risk averse and so on.

**[00:26:44 – 00:26:46]** I would say after a couple of decades of delivering

**[00:26:46 – 00:26:49]** solutions to them, that's really not my experience.

**[00:26:49 – 00:26:52]** I find them to be quite eager to embrace new technology

**[00:26:52 – 00:26:56]** once it becomes available, but also when it's actually reliable

**[00:26:56 – 00:26:58]** and secure and cost effective.

**[00:26:58 – 00:27:02]** And so, to kind of justify that assertion, I would like

**[00:27:02 – 00:27:06]** to give you 20 years of utility history technology very quickly.

**[00:27:07 – 00:27:10]** But there's a reason for it, which is that how we got here

**[00:27:10 – 00:27:12]** does affect where we're going next.

**[00:27:12 – 00:27:16]** So, starting in about 2006, believe it or not, so literally

**[00:27:16 – 00:27:19]** two decades ago, what we were able to do was to introduce

**[00:27:19 – 00:27:22]** kind of modern networking techniques to the industry.

**[00:27:22 – 00:27:26]** Sort of new RF mesh technologies, IP-based technologies, combined

**[00:27:26 – 00:27:28]** with cellular and so on.

**[00:27:28 – 00:27:33]** And what used to be thought of as revenue meters, meters that

**[00:27:33 – 00:27:36]** were largely generating consumption data for billing, really turned

**[00:27:36 – 00:27:39]** into more complicated edge sensors.

**[00:27:39 – 00:27:42]** And so the networks really started delivering richer data

**[00:27:42 – 00:27:43]** all the way to the back office.

**[00:27:43 – 00:27:47]** So not just consumption data, but now also voltage and power

**[00:27:47 – 00:27:50]** quality and harmonics and such.

**[00:27:50 – 00:27:53]** That would all land in the back office and expert utility

**[00:27:53 – 00:27:57]** personnel would write software and algorithms to analyze that.

**[00:27:57 – 00:28:02]** And the output of that inference, if you will, would essentially

**[00:28:02 – 00:28:04]** result in truck rolls.

**[00:28:04 – 00:28:07]** So this goes back to the problem of this widespread, challenging

**[00:28:07 – 00:28:10]** physical infrastructure that needed to be managed and what

**[00:28:10 – 00:28:14]** we were doing was building a telemetry network all the way

**[00:28:14 – 00:28:16]** out to the actual edge of the grid.

**[00:28:16 – 00:28:19]** So sometimes people, when they say edge, they mean substation,

**[00:28:19 – 00:28:21]** sometimes they mean transformer.

**[00:28:21 – 00:28:24]** In this case, no, we mean the actual edge of the grid, which is

**[00:28:24 – 00:28:27]** the meter at the customer premise.

**[00:28:27 – 00:28:31]** So what we have here, though, is an excellent telemetry network,

**[00:28:31 – 00:28:36]** lots of detailed data, but a fairly slow loop of improvement in the

**[00:28:36 – 00:28:39]** sense that you had to update the back office, people had to work on

**[00:28:39 – 00:28:41]** it, and then dispatch these trucks.

**[00:28:41 – 00:28:45]** Well, as happens, and over the next decade or so, what

**[00:28:45 – 00:28:47]** Moore's Law did is allowed us to deploy more compute

**[00:28:47 – 00:28:49]** and more memory at the edge.

**[00:28:49 – 00:28:54]** And as a result, what now happened was that this slow loop became

**[00:28:54 – 00:28:57]** much faster, because we could essentially take the logic from the

**[00:28:57 – 00:29:00]** back office and start pushing it out towards the edge, programming

**[00:29:01 – 00:29:04]** and configuring these edge devices to act fairly intelligently.

**[00:29:04 – 00:29:09]** In fact, as early as 2000, the early 2000s, we started

**[00:29:09 – 00:29:11]** to call this the smart grid for this reason.

**[00:29:11 – 00:29:14]** So what that intelligence at the edge of the time meant

**[00:29:14 – 00:29:16]** was that we could actually use peer-to-peer networking

**[00:29:16 – 00:29:19]** and such to have these devices

**[00:29:19 – 00:29:23]** Manage the grid much more autonomously, even then.

**[00:29:23 – 00:29:27]** So, for example, a meter would signal an outage simply directly

**[00:29:27 – 00:29:29]** up to a switch and recloser.

**[00:29:29 – 00:29:31]** We could automatically restore power.

**[00:29:31 – 00:29:34]** When an EV charger turned on and off, we could detect

**[00:29:34 – 00:29:37]** that condition and respond depending on seasonality,

**[00:29:37 – 00:29:39]** time of day, and so on.

**[00:29:39 – 00:29:40]** Same with PV.

**[00:29:40 – 00:29:43]** So the issue here, though, again, is that what we could

**[00:29:43 – 00:29:47]** do is program and configure these devices based on known

**[00:29:47 – 00:29:49]** information and known scenarios.

**[00:29:49 – 00:29:54]** What happened next and is happening now with our partnership

**[00:29:54 – 00:29:58]** with NVIDIA and others is that as we start to actually get

**[00:29:58 – 00:30:01]** GPUs and such out towards the edge,

**[00:30:01 – 00:30:06]** What really happens is that the edge becomes much more performant,

**[00:30:06 – 00:30:09]** we get better compute per watt, we can actually start learning

**[00:30:09 – 00:30:13]** directly at the edge and updating the models directly there, and

**[00:30:13 – 00:30:17]** this allows for very low latency, really dynamic orchestration now.

**[00:30:17 – 00:30:21]** Not simply responding to a predetermined set of conditions,

**[00:30:21 – 00:30:26]** but actually dynamically reacting to real-time information and so on.

**[00:30:26 – 00:30:29]** And this becomes more and more important as the infrastructure

**[00:30:29 – 00:30:33]** is getting increasingly complex.

**[00:30:33 – 00:30:35]** What that now starts to look like is something that you

**[00:30:35 – 00:30:38]** might call a software-defined grid.

**[00:30:38 – 00:30:42]** This is still very much subject to the physical limitations

**[00:30:42 – 00:30:43]** of what we have to do.

**[00:30:43 – 00:30:46]** There are still trucks that need to be rolled and so on.

**[00:30:46 – 00:30:48]** So this is not a simple problem.

**[00:30:49 – 00:30:52]** Varun pointed out, for example, that it's easy to shift load

**[00:30:52 – 00:30:54]** between giant data centers.

**[00:30:54 – 00:30:57]** This is a much more complicated issue.

**[00:30:57 – 00:31:01]** However, we are, as usual, carefully deploying this in

**[00:31:01 – 00:31:05]** a collaboration, again, between the cloud and the edge.

**[00:31:05 – 00:31:10]** Each is necessary, and neither is sufficient by itself.

**[00:31:10 – 00:31:11]** So what do I mean by this collaboration?

**[00:31:11 – 00:31:14]** You have the cloud and the edge.

**[00:31:14 – 00:31:18]** What the cloud now gets is improved visibility.

**[00:31:18 – 00:31:21]** So you can actually have very fine-grained information on

**[00:31:21 – 00:31:26]** PV, on storage, on EVs, and even behind the meter in the premise.

**[00:31:26 – 00:31:29]** We have very fine-grained information on every grid

**[00:31:29 – 00:31:33]** element, so transformers, feeders, DER elements, and so on.

**[00:31:33 – 00:31:36]** We can get power flow, we can get operating envelope,

**[00:31:36 – 00:31:40]** we can get sort of where, any number of sort of data like that.

**[00:31:40 – 00:31:44]** Feed that up to the cloud for much better forecasting and planning.

**[00:31:44 – 00:31:47]** And then all of this also feeds into kind of resiliency

**[00:31:47 – 00:31:50]** solutions and longer-term planning in that sense.

**[00:31:51 – 00:31:54]** What is happening at the edge is that we have, as I said,

**[00:31:54 – 00:31:58]** dynamic orchestration, meaning that we can actually now orchestrate

**[00:31:58 – 00:32:02]** each grid element, again, transformers, feeders, and so on.

**[00:32:02 – 00:32:05]** We can manage EVs better, charge balancing, predictive

**[00:32:05 – 00:32:09]** charging, same with PV and storage, better flow control,

**[00:32:09 – 00:32:13]** predictive charging, and so on, and build very large-scale,

**[00:32:13 – 00:32:17]** very fine-grained sort of demand response and VPP programs.

**[00:32:17 – 00:32:19]** A different way to think about this, or another way to think

**[00:32:19 – 00:32:24]** about it, is that what this increased intelligence at

**[00:32:24 – 00:32:27]** the edge gives you is a way to run essentially what you

**[00:32:27 – 00:32:30]** might think of as localized digital twins, kind of differentiating

**[00:32:30 – 00:32:34]** between, for example, what San Jose's piece of the grid operates

**[00:32:34 – 00:32:38]** as compared to the more sparse Central Valley or Lake Tahoe.

**[00:32:38 – 00:32:41]** Those kind of localized digital twins can then roll up to the

**[00:32:41 – 00:32:46]** master digital twins that are doing the longer-term planning and so on.

**[00:32:46 – 00:32:49]** What I hope to have motivated is that delivering energy

**[00:32:49 – 00:32:51]** to humans is a challenging task.

**[00:32:51 – 00:32:55]** It's a large-scale grid and very distributed and so on.

**[00:32:55 – 00:33:00]** But between the industry, NVIDIA, and ourselves, we're

**[00:33:00 – 00:33:02]** moving quite rapidly to try to improve the quality of

**[00:33:02 – 00:33:05]** service as soon as possible.

**[00:33:05 – 00:33:06]** Thank you for your attention.